TO JEFF'S HOME PAGE TO JEFF'S HOUSE |
BUILDING JANE'S HOUSE 2008 ~ 2010 |
CONTACT JANE |
|
Oct. 1 Chalo and Zairo begin the work shed.
|
Oct. 2 Zairo digs into the huge anthill (thankfully inactive!)...
|
|
and uncovers the cavity... which we'll use for concrete waste.
|
We begin the layout of things to come.
|
|
Oct. 10 Heyler tying foundation steel.
|
Laying out the house...
|
|
German digging in the drain field.
|
Oct. 21 Foundation trenches...
|
|
We get our water meter.
|
Oct. 23 Jeff and Chalo setting up the cement mixer.
|
|
And we have electricity.
|
Oct. 27 Making mud...
|
|
Oct. 30 The wall goes up...
|
The septic tank goes down...
|
|
And we don our rain gear.
|
Nov. 6 The wall...
|
|
the secret garden...
|
and the lid on the septic tank.
|
|
Nov. 10 A ton of rebar goes in the ground...
|
|
|
Nov. 12 We pour footings...
|
build gate posts...
|
|
set the first foundation blocks...
|
and we see what it is to live in the cloudforest.
|
|
Nov. 13 A neighbor helps extract the boulder from the entry.
|
Cutting the prefab concrete wall sections for beside the gate.
|
|
We have a little better access...
|
and Stormy loves the sandpile.
|
|
Nov. 21 We pour more footings...
|
and set more foundation block. It rained a lot in November.
|
|
The oncoming traffic on the way back to town.
|
Nov 29. We begin to emerge from the mud...
|
|
|
and we hang the gate.
|
|
|
Dec. 11 At last our transformer arrives.
|
|
On to the pulley... and up it goes.
|
|
|
Hold it right there!
|
Dec. 17 The first block "escarpado"...
|
|
|
and the house begins to have shape.
|
|
|
This is where we stopped for Christmas break.
|
|
|
Jan. 7 The sanitary services are finally installed (good thing we didn't get caught.)
|
|
Growing walls...
|
and conduit.
|
|
Jan. 21 Still growing...
|
|
|
some plumbing...
|
and some steel posts.
|
|
Jan. 30. We get to the top of some walls..
|
and some more steel.
|
|
Janie likes the front door...
|
and Stormy is at home in the living room.
|
|
26 centimeters, right?
|
The carport begins.
|
|
The kitchen is already a mess...
|
Feb. 2 Steel in the air...
|
|
|
Feb. 9 More beams...
|
|
more kitchen (cleaner)...
|
and more growing walls.
|
|
Feb 11 To the top of the kitchen wall...
|
|
|
and some roof framing.
|
Feb. 13 Now some roofing too.
|
|
Feb. 16 The carport has a roof...
|
and the guest rooms are getting theirs...
|
|
|
|
and the other end of the house keeps growing.
|
|
|
Feb 17 Almost to the top of the bedroom walls...
|
and the overhang of the guestroom.
|
|
Feb 19 The pantry gets its roof framing...
|
and the guestroom gets some stucco.
|
|
Feb 23 The block walls are done...
|
the living room has base rock and more stucco.
|
|
Mar 11 We pour some floor...
|
build window frames...
|
|
and place more roofing.
|
Mar 12 The big beam...
|
|
goes up... |
and up...
|
|
and up.
|
Some more floor...
|
|
and the afternoon shadows give us a nice graphic effect.
|
Our neighbors: Aliens? No, natives...
|
|
A White Face monkey that hung around a while...
|
butress roots of a giant fig...
|
|
the HUGE philodendron flower...
|
Anybody seen my mom?
|
|
Mar 13 Flooring continues...
|
Mar 16 ...and continues...
|
|
and some rafters go up in the living room.
|
Mar 17 The livingroom roof begins...
|
|
Mar 18 and grows...
|
with a sculptural effect.
|
|
It's going to go like this...
|
with the blessing of the Roof Pope (aka Chalo.)
|
|
German and Fulvio at the mixer... we do this a lot!
|
Mar 19 The entry takes shape...
|
|
and we lay out the terrace.
|
Mar 23 Little by little...
|
|
it comes along. |
Mar 27 We place the joists...
|
|
|
Apr 1 Heyler and German install the reinforcing mesh...
|
|
and it's ready to pour.
|
Here comes the mud...
|
|
|
Apr 2 Terrace completed...
|
|
all the floors are in place!
|
Apr 6 Framing the interior partitions...
|
|
putting on more roofing...
|
and some wall board.
|
|
Apr 8 The kitchen under roof.
|
Apr 10 The house starts to look like one...
|
|
with some architectural detail.
|
It's enough of a house that we spend the weekend...
|
|
Apr 19 The bathroom and closet have walls.
|
Apr 20 The guest bath gets stucco...
|
|
the master bedroom gets window frames.
|
Quinta Quetzal from the hill across the road.
|
|
Apr 22 The bathtubs...
|
|
|
Apr 24 German the Stuccomaster in the closet.
|
May 2 The master bath has some shape...
|
|
we frame the guest bath counter...
|
the electric system nears sophistication.
|
|
May 5 Counters in the kitchen...
|
|
|
The guest bath. |
A happy dog.
|
|
And the tile arrives!
|
|
|
May 6 The counters are built...
|
|
|
and we start tiling.
|
|
|
May 7 The tile spreads.
|
|
|
May 11 From one room...
|
to another... |
|
and another... |
and out to the terrace...
|
|
keeping the square.
|
Is lunch ready yet?
|
|
May 12 Mud in the closet.
|
Heyler and the laser.
|
|
Some visitors.
|
May 15 The terrace tiled.
|
|
|
What a difference it made to have the whole floor tiled!
|
|
|
And a new floor in the carport too.
|
|
May 28 The kitchen shelf is framed...
|
and at last, doors.
|
|
Won't you come in?
|
The serious mess of grout.
|
|
June 3 Neighborhood kids on their way to school...
|
June 4 Grouting the terrace...
|
|
The sattelite dish is installed.
|
|
|
Nailers for the ceiling.
|
June 12 Finish tile goes in the baths...
|
|
|
|
And Phil is back...
|
June 19 Ceilings of Laurel...
|
|
|
the only major part of the house made of wood.
|
|
The master bath's blue tile...
|
the tub has a face...
|
|
and a brain... how does this work?
|
June 22 Finish tile work continues...
|
|
and and we start to paint.
|
|
|
July 1 Heyler sticks all those tiny tiles.
|
The house starts to have colors...
|
|
|
There is still a lot of ceiling to cover.
|
|
July 6 The guest bath gets its finish.
|
|
|
Ceiling in the entry...
|
|
|
and more color.
|
|
|
July 16 Humberto grades the driveway, and we say a glad goodbye to the concrete mess.
|
|
|
a sink in the master bath...
|
finishing touches of paint...
|
|
and... glass!
|
|
|
July 22 There's a light in the kitchen...
|
a new blue pooper...
|
|
the doors are being varnished...
|
more glass in the windows...
|
|
and the entry looks welcoming.
|
July 23 Some plants and the neighbor's dogs make it even more so...
|
|
and the cool star lights in the master bedroom make one festive.
|
We have some pretty visitors.
|
|
|
Transparent designs in the wings... wow!
|
|
August 1 Moved in...
|
The girls in bed.
|
|
October: Copernicus in the kitchen...
|
Princess Topaz on the sofa.
|
|
The eaves with ceilings...
|
|
|
|
and a railing on the terrace.
|
|
November: Flowers from the farmer's market...
|
Stormy likes the rug better than she did the cement...
|
|
another pretty visitor.
|
December: Ahhh... it's so cozy here.
|